99久久久久久久,国产精品丝袜久久久久久久不卡,久久精品久久久久久久久久久久久,久久久久久国,久久中文字幕免费,国产精品美女久久久久久网站,国产精品网站在线观看免费传媒

Lu'An Jietonda New Material Co.,Ltd.

Industry news

Information

Lu'an Jietonda Chemical Co., Ltd. Phase II Project Phased Completion Environmental Protection Acceptance Public Notice

Time: 2019-04-01

According to the "Decision of the State Council on Amending the" Regulations on the Environmental Protection Management of the Completion of Construction Projects "" (State Council Order No. 682) and the Announcement of the Ministry of Environmental Protection on the Issuance of the "Interim Measures for the Environmental Protection Acceptance of Construction Projects" 2017] No. 4), the environmental protection acceptance contents (including monitoring reports and acceptance opinions) of the second phase (phased) completion of Lu'an Jietongda Chemical Co., Ltd. are now publicized as follows:

Project name: Lu'an Jietongda Chemical Co., Ltd. Phase II (phased) completion of environmental protection acceptance

Construction site: Lu'an Jietongda Chemical Co., Ltd. Phase II project is located on Anfeng Road, Chengbei Industrial Park, Jin'an District, on the east side of Phase I project.

Construction unit: Lu'an Jietongda New Material Co., Ltd.

Construction content: The scope of this acceptance includes a crushed and mixed packaging workshop with a construction area of ??1800m2, including three sets of crushing production lines and a set of mixed packaging lines; a liquid raw material warehouse, a building area of ??720m2, and a solid raw material warehouse. , A building area of ??720m2; a comprehensive building with a building area of ??3984m2; supporting pollution prevention facilities.

EIA design crushing and mixing packaging workshop is equipped with 5 sets of crushers and 3 sets of mixers. At present, there are actually 3 sets of shredders and 1 set of mixers. The fire storage pool is built at the reserved warehouse location designed by the EIA, and the reserved warehouse will no longer be built. The dormitory building designed and constructed by the EIA is not yet built and is not within the scope of this acceptance. This acceptance is a staged acceptance.

Public announcement time: April 1, 2019 to April 26, 2019 (20 working days)

Contact: Weng Shibing

Contact phone: 18056405879

Email: wsb@jietondachem.com

During the publicity period, if you have any objections to the above publicity content, please provide written feedback. Individuals must sign their real names and the unit must affix their official seals.

Attachment 2 Opinions on Stage Completion and Acceptance of Jietongda Phase II Project.pdf--Click to view

Attachment 1 Lu'an Jietongda Chemical Co., Ltd. Phase II Environmental Protection Acceptance Report.pdf--Click to view

[ BACK ]

CONTACT US

Contact us

Order

HOTLINE:

+86-564-3711165
+86-13966241417
 

Mobile version

Search

Add: 15 Li Dun, North Outskirts of Luan City, Anhui, P, R, China  P.C.:237158
Tel: +86-564-3711165 , +86-564-3711777
Fax: +86-564-3711167 E-mail: jietonda@jietondachem.com

Copyright(C)2019, Lu'An Jietonda New Material Co.,Ltd. All Rights Reserved. Supported by ChinaChemNet ChemNet Toocle Copyright Notice 備案序號(hào):皖I(lǐng)CP備11004581號(hào)

富顺县| 灵丘县| 平阴县| 广灵县| 云梦县| 桑日县| 宣恩县| 汕头市| 嘉禾县| 扶风县| 大名县| 弥勒县| 沐川县| 宁武县| 襄垣县| 尉氏县| 青州市| 盐边县| 庆城县| 商城县| 绵竹市| 双流县| 芮城县| 孝义市| 平泉县| 秭归县| 新巴尔虎右旗| 金沙县| 万安县| 张家口市| 化州市| 常山县| 安仁县| 曲麻莱县| 阜宁县| 安达市| 新和县| 章丘市| 蒙山县| 鹤山市| 安仁县|